Design & Drawings
Premium 2D & 3D – Floor Plans
Luxury 3D Elevation Designs of all views
Site survey by surveyor with instruments & drawing on the basis of survey
Civil Construction
Floor to floor height – 10’6"
Steel (500 TMT Bars) – JSW/TATA
Cement (Grade 53) – ACC/Ultratech
UG Sump built with RCC & waterproof plastered 8000 lts
Machine cut solid Block walls – 6” & 4” thickness of APCO/ Sonika/ equivalent
Internal, external and toilet wall – column joints plastering with chicken mesh
Waterproofing compound – Dr.Fixit/FOSROC for external walls
Crystalline waterproofing, Cinder filling in sunken toilets, Heat & Water proofing in Terrace
Steel/concrete lofts – Not included
Ledge wall for incorporating concealed sanitary parts – Included
Anti termite treatment
Architectural Design
Working drawing for all works
Schedule of Openings
Section and Elevation
Detailed portfolio of the home post handover
Structural Designing
Structural Design as per IS Code.
Construction drawings
Soil Test report
3D stuctural drawings & Design analysis report
Government Permit Assistance
Dream Doors Constructions will help with government agency contact, secure licenses, permits, and sanction fees for the following (will be charged additionally)
Construction Plan Sanction
Temporary Electricity connection
Permanent electrical connection
Water connection
Sewage connection
Flooring & Wall tiling
Kitchen, Dining & Bedrooms : Vitrified tiles – Rs.90/- per Sqft.
Living Room, Dining : Italian Marble/Premium Finished Vitrified tiles of 4’x8’ dimension -Rs.400/- per Sqft
Staircase, Foyer area: Granite – Rs.135/- per Sqft
Balcony, Sit-out, Passage Areas : Anti-skid tiles – Rs.60/- per Sqft
Toilet Flooring : Anti-skid tiles – Rs.70/- per Sqft
Toilet Wall Dado (full height) : Light & Highlighting Tiles – Rs.65/- per Sqft
Parking Area, setback area (if charged) tiles – Rs.55/- per Sqft
Kitchen counter top : Granite – Rs.150/- per Sqft
Kitchen Wall Dado (Up to 2’ above counter) : tiles – Rs.60/- per Sqft
Puja Room- Wall tiling –Full height- Rs. 65/- per sft
Puja Room- Granite slab- Rs-100/- per Sqft
No limitation of tile size
Tile grouting with spacer joint & with epoxy grout in bathrooms
Setback area tiles of 45 per sqft will be provided (if setback area is charged)
Painting
Internal wall & ceiling : 2 coat wall putty + 1 coat primer coat + 2 coat Tractor emulsion paint
External walls : 1 coat primer + 2 coat apex weather proof paint
Brand : Asian/Berger/Dulux
Electrical
LUnlimited light and power points in good design sense
Geyser points – All bathrooms
AC provision – in all rooms
Conduits – Good quality, hidden in slabs and walls
Fire retardant copper wire – Havells
External electrification is included
Switches & Plates – Legrand or equivalent make (Touch screen switch provision only)
A main DB & MCB – ABB/Schneider/Legrand
Provision for home automation is included
One UPS point for the house
One Electric car charging point-parking area
Plumbing
Water supply system – Internal & External
Connection for water inlet from corporation
Separate bore well & corporation lines, if needed for Kitchens. If separate tank is needed, shall be charged on actuals
External sewage system – Inspection chambers & sewage outlet to site boundary
Class B CPVC pipes – Ashirwad/Astral make
Solar & Geyser Provision
Rain water harvesting facility – Ground water recharge
PVC Overhead Tank based on per capita consumption from Sintex
FRC Chamber covers shall be provided for IC
Separate sewage & drainage lines
Separate hot & cold water lines for sink
Fixtures
Kitchen sink : SS/Granite/Carysil Kitchen accessories – Rs. 15,000/- per kitchen
CP & Sanitary fixtures such as Wash Basin, WC, Taps and other accessories like bottle trap, gratings etc.: Jaquar/Hindware – Rs.35,000/- per bathroom attached toilet and Rs.15,000/- per powder room(if applicable)
Electrical fixtures – Not Included
Doors
Main, Puja Door: Teak Wood frame & shutter including hardware – Rs.50,000/- per door
Internal Doors: Sal wood frame & flush shutter including hardware – Rs.11,000/- per door
Internal Door frames & shutters – Painted (only)
Main, puja Door – Polished with melamine spray
Bathroom, Terrace & Utility Door – Frame & shutter including hardware – Rs.9000/- per door
Door hardware – Ozone/Europa/Dorma make.
Door hinges – SS hinges
Door & Door Frame cost – Inclusive of planing, rebate, transportation etc.
Windows
UPVC windows of Kommerling or equivalent make – 5mm clear glass with MS Grills
Basic price: uPVC of with MS grill or wooden including hardware – Rs.690/- per Sqft OR Wooden windows – Sal wood Frame (5”x3”) & Honne Shutter (1.5” thickness) with clear glass and grill rods
Fabrication
Main Gate: Designer Gate – Rs.450/- per Sqft(5'X10')
External staircase & balcony railing: MS Railing – Rs. 660/- per Rft
Internal staircase railing: SS Railing – Rs.1080/- per Rft
Utility grill is not included in the package
Waterproofing is included for Utility & balcony portions
Compound Wall
Compound wall – Solid block walls of 4” thickness to suit the elevation (will be charged additionally)
Excavation, Foundation, PCC, Size Stone Masonry with DPC course above SSM
Height of compound – 5 Feet
Compound wall – Plastered & Painted
Elevation
This proposal includes luxurious elevation design for your home
A 3D elevation is presented for client to choose from & design
Additionals & deductions
Assuming the site & road level to be equal, if the ground level needs to be raised above 1’6”, it shall be charged for accordingly
Underwater or Hard rock, if it arises shall be charged for accordingly
Buying new earth/sending existing earth for excavation/backfilling purpose shall be charged on actual
Basic price of Cement is Rs.410/- per bag & Steel is Rs.65,000/- per MT. Any increase in these prices shall be charged accordingly
Percentage of opening for windows – 17% of built up
Electricity & water needs to be provided by the client free of cost to facilitate construction
The foundation's depth is five feet, and the soil's SBC is 180 KN/M2. Any additional depth above these parameters will be billed according on site conditions and actuals.
The additional costs will be charged on an actual basis if there are restrictions on material delivery or socking location and materials need to be ordered in small quantities.
A specific area to construct labour and material shed needs to be provided within 50 feet from the construction place by the client.
Any road cutting charges for the connection of Electricity and Sewage lines is not included, such works shall be charged additionally
NOTE: The material standards given above are broad guidelines, and their inclusion or absence will depend on the layout of the room.
Payment Structure
A customized payment schedule will be shared based on project specifications.
Warranty and Guarantee
Construction guarantee – 1 Year ; Waterproofing warranty – 10 Years
Guarantee & warranty is provided on Stamp paper